Yard Machines 840 thru 849 Operations Instructions Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 33
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
V 06/13
18 Start-up PS Powder sieve machine
Grounding of the sieve insert
The grounding of the sieve insert is done by a grounding spring (5) which
is grounded by continuous contact with the sieve cover.
Attention:
Take care to install the double sieve correctly!
Grounding of the sieve insert
1 Sieve mesh (fine) 4 Sieve mesh (rough)
2 Sieve assistance 70x) 5 Grounding spring
3 Clamp ring
Seating of the clamp ring
The clamp ring (3) must be checked for properly seating before every
start-up. If the clamp ring does not sit correctly, the gasket of the sieve
insert can be damaged and the powder can escape into the environment.
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 32 33

Comments to this Manuals

No comments